Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Damen DOP Dredge Pump Used in Harderwijk
Business & Finance

May 30, 2016 · about 10 years ago

Damen DOP Dredge Pump Used in Harderwijk

Along the waterfront in Harderwijk, an old town in the center of the Netherlands, a new residential area is being built. The site was formerly used as industrial area, which has resulted in a polluted top layer of the soil. To avoid handling this polluted material, Boskalis used an innovative and ch

1 minutes read
  • LinkedIn
  • X
  • Email

Along the waterfront in Harderwijk, an old town in the center of the Netherlands, a new residential area is being built.

The site was formerly used as industrial area, which has resulted in a polluted top layer of the soil. To avoid handling this polluted material, Boskalis used an innovative and challenging method: a DOP250 was used to mine clean sand from deeper down, and cover the polluted layer – which remained in place.

The DOP is lowered in the hole using its own weight, to a max depth of ca -8.5m. Once at this depth plenty of jet nozzles spaying sideways create a pumpable mixture. The dredged mixture is pumped to a spoil field approx. 600 m away.

The mined sand is entirely clean, good quality, coarse building sand – excellent for sealing of the polluted soil. When the projects is ready, the entire area will be covered with a 2m layer of clean top soil.

Great care is taken to control the complex dredging process. The jet water used for losing the soil and transporting the sand, is recirculated. During the recirculating process the quality of the water is monitored.

For the full duration of the process the water has been tested as clean and unpolluted. The 3m thick polluted layer of soil has proven to remain in situ. Moreover, the sand won is continually checked and found clean and unpolluted.

[mappress mapid=”22456″]

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & FinanceEquipmentTechnology

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

14 days ago

Marinex wins Brunswick dredging contract
Business development

Marinex wins Brunswick dredging contract

14 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

14 days ago
Marinex wins Brunswick dredging contract
Business development

Marinex wins Brunswick dredging contract

14 days ago