DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Wares Creek Project in Bradenton Proves Success
Business & Finance

June 9, 2016 · about 10 years ago

Wares Creek Project in Bradenton Proves Success

The recently completed Wares Creek Project proved to be a resounding success and operated as designed after sustaining impacts from Tropical Storm Colin. No local flooding was reported or noted along the creek after the storm. “Tropical Storm Colin gave us the perfect opportunity to find out how wel

1 minutes read
  • LinkedIn
  • X
  • Email

The recently completed Wares Creek Project proved to be a resounding success and operated as designed after sustaining impacts from Tropical Storm Colin.

No local flooding was reported or noted along the creek after the storm.

“Tropical Storm Colin gave us the perfect opportunity to find out how well this project would respond to a significant rain event ,” said Project Manager Laurel Reichold . “ We are pleased with the results and the flood protection it provided to the local community.”

Rain totals peaked at 2.7-inches on June 6 and 1.6-inches on June 7, according to Weather Underground for sites around Bradenton, Fla.

At the 21st Avenue Bridge, flows fluctuated between 3 to 5-feet, but no flooding was reported. Flow was significant through the creek, but post storm inspection by the Corps documented little disturbance to the banks.

The constructed project is designed to provide reduced flood stages for all flood events, with a bank-full capacity greater than the 5-year flood event.

“Although Tropical Storm Colin represents less than a 1-year flood event, the project functioned and operated without impact from the storm ,” said Reichold. “ This should give residents peace of mind that the project is ready to tackle the next storm event and those to come.”

The Wares Creek Project reduces flood risk and related issues within the Cedar Hammock-Wares Creek basin in Manatee County, Fla.

[mappress mapid=”22514″]

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Boskalis, McLaughlin & Harvey complete Dover land reclamation
  2. 2Jones Bros wraps up Kinmel Bay coastal defense project
  3. 3RSGT, CMA CGM, Mawani invest big in Jeddah Islamic Port’s Terminal 4
  4. 4Rohde Nielsen completes maintenance dredging at Costa da Caparica

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free