Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Witteveen+Bos Wins Feasibility Study for New Port in Colombia
Business & Finance

July 22, 2016 · about 10 years ago

Witteveen+Bos Wins Feasibility Study for New Port in Colombia

Royal Port S.A. has commissioned international engineering and consultancy firm Witteveen+Bos to conduct a feasibility study for an entirely new port on the mouth of the Magdalena River, near the city of Barranquilla in Colombia. Royal Port wants to use the study to obtain the required port concessi

1 minutes read
  • LinkedIn
  • X
  • Email

Royal Port S.A. has commissioned international engineering and consultancy firm Witteveen+Bos to conduct a feasibility study for an entirely new port on the mouth of the Magdalena River, near the city of Barranquilla in Colombia.

Royal Port wants to use the study to obtain the required port concession from river management authority Cormagdalena.

For this project Witteveen+Bos has joined forces with two subcontractors: the Maritime Research Institute Netherlands (MARIN) and Colombia’s Antea Group.

The new port will cover a total area of 134 hectares, and must be suitable for both inland and sea-going vessels.

In the first phase of the project, Witteveen+Bos will investigate the technical feasibility of the planned port using hydrodynamic modelling techniques and a simulation to demonstrate the plan’s nautical safety. This phase is expected to be completed in October 2016 and will be followed by the detailed design of the port.

Witteveen+Bos experts in the fields of master planning, hydraulic modelling and port structures will perform this work partly in the Netherlands and partly in Colombia.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & FinanceProject & Tenders

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Port of Vancouver: Dredging work at Second Narrows set for September
Business development

Port of Vancouver: Dredging work at Second Narrows set for September

about 1 month ago

United States to fund construction of Poti Seaport’s new berth
Berth Expansion

United States to fund construction of Poti Seaport’s new berth

about 1 month ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Port of Vancouver: Dredging work at Second Narrows set for September
Business development

Port of Vancouver: Dredging work at Second Narrows set for September

about 1 month ago
United States to fund construction of Poti Seaport’s new berth
Berth Expansion

United States to fund construction of Poti Seaport’s new berth

about 1 month ago