DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Rubio Urges USACE to Approve Permits for Florida Bay Restoration
Business & Finance

August 17, 2016 · about 10 years ago

Rubio Urges USACE to Approve Permits for Florida Bay Restoration

U.S. Senator Marco Rubio is urging the U.S. Army Corps of Engineers to support the South Florida Water Management District’s (SFWMD) proposed operational plan to allow for much-needed freshwater to flow into Florida Bay. In a letter sent recently, Rubio asked the Corps to “review the required permit

1 minutes read
  • LinkedIn
  • X
  • Email

U.S. Senator Marco Rubio is urging the U.S. Army Corps of Engineers to support the South Florida Water Management District’s (SFWMD) proposed operational plan to allow for much-needed freshwater to flow into Florida Bay.

In a letter sent recently, Rubio asked the Corps to “review the required permitting necessary for the SFWMD to begin its work in restoring Florida Bay as expeditiously as possible.”

South Florida Water Management District construction crews began work a couple of weeks ago on a key component of the plan to deliver more fresh, clean water to the ailing Florida Bay.

The plan will double the flow of water into the headwaters of Taylor Slough, which connects to the bay. This means on average as much as 6.5 billion gallons more freshwater per year will reach the bay to help restore seagrass that succumbed to the drought of summer 2015.

Using a hydraulic ram, crews began to remove a portion of the S-327 Weir in Miami-Dade County so that more water can flow from west of Homestead into Taylor Slough in Everglades National Park, and ultimately to the bay.

The weir operates much like a dam but allows water to flow over the top to help manage water levels.

The work entails degrading 250 feet of the 1,900 foot weir by excavating 170 cubic yards of reinforced concrete off the top and stockpiling 850 cubic yards of limestone fill.

[mappress mapid=”22873″]

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free