DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›New Cutter Suction Dredger for Brighton Marina
Business & Finance

September 27, 2016 · about 10 years ago

New Cutter Suction Dredger for Brighton Marina

The Brighton Marina team welcomed Marina Master MII, their new cutter suction dredger (CSD), on September 13, 2016. Measuring 14 meters in length and weighing 25 tonnes, the CSD ‘Doris’ was successfully launched into the water to begin the sea trials in preparation for next season. The CSD is design

1 minutes read
  • LinkedIn
  • X
  • Email

The Brighton Marina team welcomed Marina Master MII, their new cutter suction dredger (CSD), on September 13, 2016.

Measuring 14 meters in length and weighing 25 tonnes, the CSD ‘Doris’ was successfully launched into the water to begin the sea trials in preparation for next season.

The CSD is designed by Norfolk based Goodchild Marine Services and manufactured in Italy.

“Having taken delivery of ‘Doris’ at Brighton, we now have the ability to augment its routine dredging program. The method of dredging using a self-contained cutter suction unit reduces the need to remove pontoon fingers and overall time needed to prepare, dredge and reinstate berths after ,” said Marina Manager, Daniel Heckford.

“Using her unique extendable arm ‘Doris’ will be able to dredge under pontoons and the main concourses easily, and eat through material quicker than back-hoe methods. This is a really exciting time for Brighton, as the dredger showcases the level of investment Premier are prepared to spend at what is still the largest marina in the UK.”

Officially owned and operated by Premier Marinas, the CSD ‘Doris’ will undertake extra dredging works to complement the current annual dredging program.

[mappress mapid=”23060″]

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free