DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Cosco to Build New Container Terminal at Khalifa Port
Business & Finance

September 28, 2016 · about 10 years ago

Cosco to Build New Container Terminal at Khalifa Port

Abu Dhabi Ports has awarded a concession to build and operate a new container terminal at Khalifa Port to Cosco Shipping Ports Limited – Abu Dhabi (CSPL SPV), a wholly-owned subsidiary of Cosco Shipping Ports Limited. As per the agreement, the company will be entitled concession rights of Khalifa Po

1 minutes read
  • LinkedIn
  • X
  • Email

Abu Dhabi Ports has awarded a concession to build and operate a new container terminal at Khalifa Port to Cosco Shipping Ports Limited – Abu Dhabi (CSPL SPV), a wholly-owned subsidiary of Cosco Shipping Ports Limited.

As per the agreement, the company will be entitled concession rights of Khalifa Port Container Terminal 2 for a span of 35 years, with a renewable period of 5 additional years.

Cosco Shipping will operate a container terminal with a draft depth of 18 meters, with 1200 meters of quay wall and adjacent land.

The first 800 meters of the quay length and the corresponding concession area are expected to commence operations in H1 2018 and the later 400 meters (and the corresponding expanded concession area) is expected to start its operations in 2020.

Once the expansion areas are occupied, the concession area will span an area of approximately 70 hectares with 3 berths, which will add 2.4 million TEUs a year to the port’s existing capacity of 2.5 million TEUs.

The agreement includes the option for a further 600 meters of quay length in the future to allow for anticipated volume growth.

The nominal annual handling capacity will increase to 3.5 million TEUs when all phases are complete, creating a new overall annual capacity of up to 6 million TEUs.

[mappress mapid=”23065″]

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free