DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›RBV Contracting Wins Red Run Drain Deal
Business & Finance

October 4, 2016 · about 10 years ago

RBV Contracting Wins Red Run Drain Deal

The U.S. Army Corps of Engineers, Detroit District, has awarded a contract to RBV Contracting, Inc. of Detroit, MI, to stabilize a portion of the north bank of the Red Run drain in Macomb County, Michigan. The project will help prevent sediment buildup in the channel from an area of sloughing bank b

1 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers, Detroit District, has awarded a contract to RBV Contracting, Inc. of Detroit, MI, to stabilize a portion of the north bank of the Red Run drain in Macomb County, Michigan.

The project will help prevent sediment buildup in the channel from an area of sloughing bank between Dequindre Rd. and Ryan Rd.

The banks will be flattened and rip-rap will be added to the toe of the slope and the lower portion of the bank to prevent the bank from continuing to deteriorate and adding sediment build up in the channel.

This environmental infrastructure work meets the goals of a wide array of project partners including the Oakland County Water Resources Commissioner (WRC), the USACE and Michigan Department of Environmental Quality (MDEQ).

The project is being executed through a Project Partnership Agreement between the WRC and the USACE.

“This project is the second phase of stabilization work in this area of the Red Run Drain ,” said Paul Powell, USACE Project Manager.

“Previously an interceptor trench was installed to capture ground water and direct it into the drain through sewer structures. This prevents ground water pressure on the face of the bank and minimizes sloughing on the bank. This phase will include flattening the slope and installing rip-rap to further prevent erosion.”

The contractor will begin work this fall and have the construction substantially complete by the summer of 2017.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free