DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›USACE Awards $5.2 Million Buffalo City Contract
Business & Finance

October 5, 2016 · about 10 years ago

USACE Awards $5.2 Million Buffalo City Contract

The U.S. Army Corps of Engineers, St. Paul District, awarded a $5.2 million contract to Dubuque Barge and Fleeting Service, from Dubuque, Iowa, to remove dredged material from a temporary storage area near Buffalo City, Wisconsin, on September 29. The project consists of transferring more than 400,0

2 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers, St. Paul District, awarded a $5.2 million contract to Dubuque Barge and Fleeting Service, from Dubuque, Iowa, to remove dredged material from a temporary storage area near Buffalo City, Wisconsin, on September 29.

The project consists of transferring more than 400,000 cubic yards of dredged material from Lost Island, located on the Mississippi River, west of Buffalo City, Wisconsin, via mechanical and/or hydraulic excavation methods to the Corps-owned upland placement site located near Kellogg, Minnesota.

Removing the material from the temporary site is required in order to continue maintaining the 9-foot navigation channel. Maintaining the channel is vital to ensuring bulk commodities, such as corn and soybeans, can be safely and efficiently transported to global markets.

The project is expected to be completed by the end of 2019.

Maintaining the channel

Sedimentation in the channel is caused by the normal cycle of sand movement, erosion from high water or heavy rains and changes in river currents. To maintain the 9-foot navigation channel, the Corps must remove material that settles in the channel area. Mechanical or hydraulic dredging are methods used for the removal of that material.

This material is placed in designated areas along the river. Some of these areas are beneficial use placement areas. Beneficial use of dredged material is the productive use of the material by the public or private sectors.

Examples of common beneficial uses of dredged material are upland habitat development, aquatic habitat enhancement, creation of areas for bird nesting, beach nourishment, winter road maintenance, levee repair and improvement, bank protection and general purpose fill.

[mappress mapid=”23091″]

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free