DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Dredging Work at Ukrainian Seaports in Full Swing
Business & Finance

October 12, 2016 · about 10 years ago

Dredging Work at Ukrainian Seaports in Full Swing

The scope of dredging work at the Ukrainian seaports, conducted from the beginning of 2016, exceeded 4 million m³, the Ukrainian Sea Ports Authority (USPA) said in its latest announcement. Dredging operations have been completed at the inner harbor of Mariupol Port and 505.000m³ of dredged material

1 minutes read
  • LinkedIn
  • X
  • Email

The scope of dredging work at the Ukrainian seaports, conducted from the beginning of 2016, exceeded 4 million m³, the Ukrainian Sea Ports Authority (USPA) said in its latest announcement.

Dredging operations have been completed at the inner harbor of Mariupol Port and 505.000m³ of dredged material were removed.

Maintenance dredging in the approach channel to the Coal Harbor is in progress – the scope of this year’s dredging works at the port totaled 1.2 million m³.

As of October 2016, dredging operations in the approach channel and water area of Berdyansk seaport amounted to 418.000m³, USPA said.

From the beginning of this year, 239.000m³ of material have been dredged at Deep Water Fairway (DWF) Danube-Black Sea and 285.000m³ of material from the Bugsko-Dneprovskiy Lymansky Channel (BDLC) were also removed.

Maintenance dredging at the water area of Odessa seaport removed 72.000m³ and during the dredging works at Dnestrovsko-Limansky Channel of the Belgorod-Dnestrovsky seaport, the contractors removed around 780.000m³ of material.

Maintenance dredging has also been completed at Yuzhny seaport with the removal of 461.000m³.

Port Yuzhny is to see capital dredging in the nearest time, and the tenders are to be announced for operational dredging at Izmail and Odessa ports.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free