DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›DPWH Introduces Plan to Alleviate Flooding in Southern Pampanga
Business & Finance

October 19, 2016 · about 9 years ago

DPWH Introduces Plan to Alleviate Flooding in Southern Pampanga

The Department of Public Works and Highways (DPWH) targets to reduce the damage brought by perennial flooding in southern Pampanga through the implementation of the Integrated Disaster Risk Reduction and Climate Change Adaptation (IDRR-CCA) Measures in Low Lying Areas of Pampanga Bay Project. A tota

1 minutes read
  • LinkedIn
  • X
  • Email

The Department of Public Works and Highways (DPWH) targets to reduce the damage brought by perennial flooding in southern Pampanga through the implementation of the Integrated Disaster Risk Reduction and Climate Change Adaptation (IDRR-CCA) Measures in Low Lying Areas of Pampanga Bay Project.

A total of eight deteriorated sluice gates are set to be repaired and replaced near the right bank of the Pampanga River to regulate the stream of water and prevent the backflow of the rivers.

Dredging and embankment works will also be conducted at the river channel network in the Third River, including Eastern Branch, Caduang Tete and Sapang Maragul waterways to improve their drainage capacities and to minimize the occurrence of flood in the areas around the rivers.

The flood-control project, which is being undertaken by the DPWH Unified Project Management Office-Flood Control and Management Cluster (UPMO-FCMC), started its 17-month detailed engineering and pre-construction stage last March 2016.

When completed, the project will benefit the Kapampangans residing in the municipalities of Macabebe, Masantol, Minalin and Sto. Tomas.

[mappress mapid=”23152″]

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free