DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Hatea River Dredging Underway
Business & Finance

October 19, 2016 · about 9 years ago

Hatea River Dredging Underway

Hatea River boaties now have a bigger than usual obstacle to watch for on their trips to and from the Town Basin. Dredging has started on two sections of the Hatea River near the Town Basin, with the dredging barge and tug likely to be in operation somewhere along the section of river between the [&

2 minutes read
  • LinkedIn
  • X
  • Email

Hatea River boaties now have a bigger than usual obstacle to watch for on their trips to and from the Town Basin.

Dredging has started on two sections of the Hatea River near the Town Basin, with the dredging barge and tug likely to be in operation somewhere along the section of river between the Town Basin and Kissing Point for the next two months.

“ As they watch for the usual obstacles, we ask that they also keep an eye out for the tug and barge which are big and heavy and need plenty of space to manoeuvre ,” said Rachael Mannion, Whangarei District Council Infrastructure and Services Project Engineer.

The dredging is part of a three-year program aimed at improving the view along the Hatea Loop, and is being carried out by Opua-based Total Dredging Ltd, part of the Total Marine Group.

“ We ask people to be especially careful when the dredging work is occurring close to the shore on the Hatea Loop walkway. ”

This year’s dredging will start near the Town Basin and progress as far as the Art Park. It is expected to cost $250,000, including work at Bell Block on Riverside Drive opposite Kissing Point to make room for disposal of the dredged material.

The dredge loads the material onto a barge which takes it to Kissing Point to be offloaded into a holding container next to the water. It is then loaded onto a truck and transported across the road into Bell Block where it is poured into ponds and allowed to dry out.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free