DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Van Oord to Use New Dike Improvement Method
Business & Finance

October 19, 2016 · about 9 years ago

Van Oord to Use New Dike Improvement Method

Van Oord and GMB are about to use innovative dike pins for the first time on a dike improvement project between Hagestein and Opheusden, the Netherlands. The great advantage of this dike reinforcement technique is that it can be used in places where working space is limited. The client, Rivierenland

2 minutes read
  • LinkedIn
  • X
  • Email

Van Oord and GMB are about to use innovative dike pins for the first time on a dike improvement project between Hagestein and Opheusden, the Netherlands.

The great advantage of this dike reinforcement technique is that it can be used in places where working space is limited.

The client, Rivierenland Water Board, is embracing this new method for use in the Hagestein-Opheusden Dike Improvement Project.

Dike pins are steel anchor rods encased in cement. They are inserted into the underlying layer of sand and prevent the possibility of the dike collapsing during floods. Installing the pins is an effective way of making dikes safer.

When working space is limited, e.g. by houses and vegetation, the problem can be solved by using this innovation. The dike pins are installed completely inside the existing dike profile, so that it is not necessary to interfere with the crown or the foot of the dike.

During the work, the surrounding area suffers much less disruption than with the traditional installation of sheet piling or soil replenishment, while still being kept safe from flooding.

This innovative method of dike reinforcement is the result of close cooperation between Van Oord, GMB, BAM Speciale Technieken and RoyalHaskoningDHV. The innovation has been further improved on the back of a number of tests and pilot projects.

According to Johan Bakker, Director of Innovation at Rivierenland Water Board : “ Innovation succeeds more often than not. That is also the case here. To keep the Netherlands safe and to keep safety affordable, we – in a joint effort – have to pull out all the stops.”

The HOP dike improvement scheme involves reinforcing about 18 km of dike spread over two dike rings, ten work areas and five municipalities. The first and last work areas are 40 km apart on the southern bank of the Lower Rhine and Lek.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free