Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Mud Cat Dredger Selected for Boise Phosphorous Project
Business & Finance

October 20, 2016 · about 9 years ago

Mud Cat Dredger Selected for Boise Phosphorous Project

Ellicott Dredge Technologies (EDT) has announced that the City of Boise, Idaho chose it to design a Mud Cat 40E Custom (MC-40EC) dredger for the city’s innovative Dixie Drain Phosphorous Offset Project. Boise will use the MC-40EC dredger to remove phosphorous from the Boise Watershed. The custom fea

2 minutes read
  • LinkedIn
  • X
  • Email

Ellicott Dredge Technologies (EDT) has announced that the City of Boise, Idaho chose it to design a Mud Cat 40E Custom (MC-40EC) dredger for the city’s innovative Dixie Drain Phosphorous Offset Project.

Boise will use the MC-40EC dredger to remove phosphorous from the Boise Watershed.

The custom features include the overall length of the dredger, the slurry pump flow and pressure, a fully protected auger system, and an auger calibrated to specific digging depths for the project.

In addition to its custom features, the MC-40EC boasts several other unique systems.

EDT has equipped the dredger with its Automated Remote Control System, which allows for custom features to be integrated into a fully automated remote dredging system.

The addition of a shore mounted control panel enables this option. The NEMA 4 control panel allows users to operate and monitor all the onboard functions during operation.

For the Dixie Drain Project, the MC-40EC was also equipped with Auto Sense™ and Lateral Sense™. Together, they utilize a rail or cable system that will allow the entire pond to be dredged without the use of an operator.

The Dixie Drain Phosphorous Offset Project is the first of its kind effort to remove excessive phosphorous loads from the Boise and Snake River.

Excessive phosphorous runoff deteriorates water quality and causes harmful algae blooms. Instead of adding costly filters to the city’s water treatment plant, the project will divert water from Dixie Drain to holding ponds where chemical additives will remove the phosphorous from the water.

The phosphorous will settle as sediment onto the bottom of holding ponds, which the MC-40EC will pump away into holding cells. When complete, the project will be able to remove over 140 pounds of phosphorous per day.

[mappress mapid=”23160″]

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & FinanceEquipmentTechnology

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Marinex wins Brunswick dredging contract
Business development

Marinex wins Brunswick dredging contract

14 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Marinex wins Brunswick dredging contract
Business development

Marinex wins Brunswick dredging contract

14 days ago