DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›River Windrush Bank Reinforced
Business & Finance

November 17, 2016 · about 9 years ago

River Windrush Bank Reinforced

An Environment Agency field team has recently finished re-aligning the Newbridge Cut away from the River Windrush. In addition to this the team is reinforcing the bank of the River Windrush near Standlake in Oxfordshire. The work forms part of a program of maintenance works in the Thames Valley to e

2 minutes read
  • LinkedIn
  • X
  • Email

An Environment Agency field team has recently finished re-aligning the Newbridge Cut away from the River Windrush.

In addition to this the team is reinforcing the bank of the River Windrush near Standlake in Oxfordshire.

The work forms part of a program of maintenance works in the Thames Valley to ensure that rivers and assets remain in good condition over the coming months.

During routine inspections, Environment Agency officers discovered that an embankment located between the River Windrush and the Newbridge Cut near Standlake had been eroded to the point that the slope facing the Windrush was vertical and undermined in places. The embankment was at high risk of failing during high flow conditions.

Gareth Simpson, Flood and Coastal Risk Management Officer from the Asset Performance Team said: “ By re-aligning the Newbridge Cut away from the River Windrush and reinforcing the bank of the Windrush, we have significantly reduced the risk of floodwater breaching the embankment and flowing to nearby properties .”

“ Erosion is an ongoing process so the situation would only have worsened. Our team worked quickly to re-align the Newbridge Cut and reinforce the riverbank. We recycled the spoil created by excavating the new alignment by using it to widen the existing bank ,” added Gareth Simpson.

110 tonnes of rock armor was also imported to the site and placed along the left bank of the Windrush to further protect and reduce the rate of erosion.

[mappress mapid=”23256″]

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free