DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Rum River Dredging Plan on the Table
Business & Finance

December 1, 2016 · about 9 years ago

Rum River Dredging Plan on the Table

The City of Anoka is proposing to excavate the sediment deposits out of the “lagoon” area within the Rum River, located just north of the Burlington Northern Santa Fe railroad tracks and the Anoka County Rum River Human Services Center (west of 4th Street and east of the Rum River). Sediment has acc

2 minutes read
  • LinkedIn
  • X
  • Email

The City of Anoka is proposing to excavate the sediment deposits out of the “lagoon” area within the Rum River, located just north of the Burlington Northern Santa Fe railroad tracks and the Anoka County Rum River Human Services Center (west of 4th Street and east of the Rum River).

Sediment has accumulated within this area from an old stormwater pipe outlet.

All stormwater in this watershed is now (since 2009) routed through the storm water pond east of this area, which intercepts the vast majority of sediments currently.

The City contracted Hakanson Anderson in 2012 to complete a survey of the lagoon area to determine the amount of sediment present and how much would need to be removed to restore the lagoon area back to “historic conditions.”

The survey determined up to 1.9 feet of sediment was located in the northern portion of the lagoon and a total of 2,000 cy is estimated to be excavated (surface area is 0.35 acres).

The sediment deposit removal will be accomplished via excavator or backhoe.

This work is expected to occur in the winter when surrounding soils are frozen and can support equipment used for excavation, unless otherwise advised by the regulatory agencies. By removing the sediment, it will restore the lagoon back to native soils and will also allow for canoes and kayaks to access the Rum River through the lagoon.

The lagoon area will have enough depth for a small watercraft (pontoon, paddle boat, etc.) to access and use the proposed dock structure.

[mappress mapid=”23321″]

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free