DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Narrow River Restoration Scheme Moves Ahead
Business & Finance

December 12, 2016 · about 9 years ago

Narrow River Restoration Scheme Moves Ahead

Work has been ongoing since December 1 along the Narrow River as part of the salt marsh restoration and elevation pilot scheme, State of Rhode Island official website said in its latest project update. The contractor, Patriot Marine, has been dredging down near Sedge Island. The crew is approximatel

2 minutes read
  • LinkedIn
  • X
  • Email

Work has been ongoing since December 1 along the Narrow River as part of the salt marsh restoration and elevation pilot scheme, State of Rhode Island official website said in its latest project update.

The contractor, Patriot Marine, has been dredging down near Sedge Island.

The crew is approximately one-third of the way dredging one of the sections planned for this area, though work was halted unexpectedly on Monday, December 5 because of mechanical issues.

Work resumed later in the week, once the new piece arrived. Patriot Marine has been working long hours since beginning, and dredging and production operations are going as expected, the update stated.

One method of restoration involves placing dredged material on the surface of the marsh to raise the elevation so that plants can thrive.

This method, often called thin layer deposition, will be used in the Narrow River. Material will be dredged from select locations to create depths where eelgrass, another important habitat, can grow.

The dredged materials will then be dispersed on the adjacent marsh surface to slightly increase the marsh’s elevation, primarily in areas where the vegetation has died off or become stressed from prolonged flooding.

These areas will be replanted with marsh grasses.

From Narrow River Kayaks south to Sedge Island, crews are depositing material from the river onto different areas of the marsh.

The dredge footprint creates an approximately 65-foot wide channel in the river. Sand from the river is being used to help elevate the marshes on the eastern side.

A new low-flow method of dredging is being used to protect the existing marsh plants.

Marine dredging is only permitted in the fall and winter months to avoid impacts to fish species such as flounder.

[mappress mapid=”23354″]

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free