DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›BMGS Wins Riga Port Extension Contract
Business & Finance

December 14, 2016 · about 9 years ago

BMGS Wins Riga Port Extension Contract

The Freeport of Riga company “Rīga Universal Terminal” (RUT) has entered into an agreement with hydro-technical construction company JSC “BMGS” for the reconstruction of two berths, reported the FRA today. FRA has transferred berths ZO-1 and ZO-2 to RUT for a long-term lease and early this year the

2 minutes read
  • LinkedIn
  • X
  • Email

The Freeport of Riga company “Rīga Universal Terminal” (RUT) has entered into an agreement with hydro-technical construction company JSC “BMGS” for the reconstruction of two berths, reported the FRA today.

FRA has transferred berths ZO-1 and ZO-2 to RUT for a long-term lease and early this year the Freeport of Riga Board has supported the company’s plan to launch reconstruction project.

According to FRA, the agreement with the JSC “BMGS” will provide for two berths’ extension, dredging of the water area and storm water sewer system outlet construction.

Berth reconstruction works for ZO-1 berth include extension for 50 meters southwards, reaching 207 meters in length. In addition two mooring piles will be built and lighting to be installed. It is planned to maintain the existing depth scale – 10.25 meters BAS (Baltic height system).

As for the berth ZO-2 – it is planned to extend it northward for 96.8 meters, reaching 260 meters in length. It is also planned to carry out a new underwater sheet piling wall construction at the berth. After reconstruction the berth depth will be 12 meters BAS.

Backfilling works for new berth area will be carried out on the territory of 3.710m², dredging works will be carried out in the water area on the territory of 7.746m². The project will also provide for construction of a storm water sewer with local treatment plant and outlet.

Reconstruction of both berths is to be completed by December 2017.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free