Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Trelleborg Gear for ¡VAMOS! Mining Project
Business & Finance

February 14, 2017 · about 9 years ago

Trelleborg Gear for ¡VAMOS! Mining Project

Trelleborg’s engineered products operation has supplied specialty mining hoses to ¡VAMOS! (Viable Alternative Mine Operating System), a 42-month research and development project designed to foster the exploitation and rehabilitation of under exploited and abandoned European deposits of mineral resou

1 minutes read
  • LinkedIn
  • X
  • Email

Trelleborg’s engineered products operation has supplied specialty mining hoses to ¡VAMOS! (Viable Alternative Mine Operating System), a 42-month research and development project designed to foster the exploitation and rehabilitation of under exploited and abandoned European deposits of mineral resources.

With Europe’s more accessible mineral deposits largely depleted, deeper-lying resources remain submerged in mines abandoned after flooding or in unmined deposits below the water table.

Funded by the European Union’s Horizon 2020 program, the €12.6 million ¡VAMOS! project aims to design and build a robotic, underwater mining prototype for field tests at four inactive submerged mineral deposits at two locations across Europe.

The revolutionary mining technique involves remote operation of the underwater mining equipment from an offshore control station without affecting the local groundwater level.

According to the release, Trelleborg will develop a 200 meter riser hose connecting the underwater mining vehicle to the support vessel on the surface. The hose will have an internal diameter of 200mm and a maximum working pressure of 15 bar.

In addition, Trelleborg will also develop a 236 meter floating slurry hose that conveys the excavated slurry to the shoreline for dewatering.

Designed to float at the surface in fully loaded condition, the hose will have an internal diameter of 150mm and a maximum working pressure of 15 bar.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & FinanceEquipmentTechnology

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

14 days ago

Marinex wins Brunswick dredging contract
Business development

Marinex wins Brunswick dredging contract

14 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

14 days ago
Marinex wins Brunswick dredging contract
Business development

Marinex wins Brunswick dredging contract

14 days ago