DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Wilton Flood Defense Scheme on Display
Business & Finance

March 7, 2017 · about 9 years ago

Wilton Flood Defense Scheme on Display

The Environment Agency is about to hold a public consultation in Wilton, near Salisbury, to explain how it plans to reduce flood risk to local homes and businesses. The consultation on the Wilton flood defense scheme will take place on March 10th 2017, from 3pm to 7pm, at the Cricket Pavilion Recrea

1 minutes read
  • LinkedIn
  • X
  • Email

The Environment Agency is about to hold a public consultation in Wilton, near Salisbury, to explain how it plans to reduce flood risk to local homes and businesses.

The consultation on the Wilton flood defense scheme will take place on March 10th 2017, from 3pm to 7pm, at the Cricket Pavilion Recreational Ground.

Wilton’s existing flood defenses protect some areas in the center of the town. In large flood events, flood water can bypass the defenses and flow across the recreational ground towards the Castle Lane area. Properties in Crow Lane are also at risk.

According to the Environment Agency, the proposed solution is to build a raised flood embankment around the edge of the recreational ground, joining the existing flood defenses beside Wiley Terrace. An access ramp would be provided over the embankment. A flood wall is also being proposed to protect properties in Crow Lane.

The Environment Agency aims to secure funding and obtain planning permission for a suitable scheme by the autumn of 2017. It will then draw up a detailed design and carry out further public consultation before starting construction in early 2018.

If all goes according to schedule, the new scheme should be completed by the summer of 2018.

[mappress mapid=”23712″]

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free