DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Kennebec River Dredging Project up for Comment
Business & Finance

March 14, 2017 · about 9 years ago

Kennebec River Dredging Project up for Comment

The U.S. Army Corps of Engineers, New England District, is seeking comments for the proposed maintenance dredging of the lower Kennebec River. According to the announcement, USACE calls for emergency maintenance dredging of portions of the Federal navigation project in the lower Kennebec River, betw

1 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers, New England District, is seeking comments for the proposed maintenance dredging of the lower Kennebec River.

According to the announcement, USACE calls for emergency maintenance dredging of portions of the Federal navigation project in the lower Kennebec River, between Phippsburg and Bath, Maine.

The emergency dredging is needed to provide safe passage of the USS Rafael Peralta, a United States Navy Destroyer scheduled to transit the channel on or about April 27, 2017.

The Corps reported that recent hydrographic surveys of the Doubling Point and Popham Beach areas indicate that the channel has shoaled to -18.4 feet below Mean Lower Low Water (MLLW) across almost the entire 500 feet wide channel at Doubling Point and to -16.7 feet below MLLW across more than half the authorized channel near Popham Beach.

The aim of this dredging campaign is restore the channel to its authorized dimensions and provide safe operating depths for the USS Rafael Peralta and subsequent future transits by other vessels of this type.

USACE plan calls for a hopper dredge to remove about 70,000 cubic yards (cy) of clean sand. Approximately 50,000 cy of material will be removed from the Doubling Point area and approximately 20,000 cy of material will be removed from the Popham Beach area.

The deadline for sending comments on the proposed work is March 28, 2017.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free