Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Dredge Currituck Ready for Ponce de Leon Inlet Dredging
Business & Finance

April 3, 2017 · about 9 years ago

Dredge Currituck Ready for Ponce de Leon Inlet Dredging

The U.S. Army Corps of Engineer’s dredger Currituck will next week begin the Ponce de Leon Inlet maintenance dredging project. According to the Corps, the maintenance dredging of the inlet is scheduled to begin April 11 and provides an interim solution to sand deposited in the inlet by Hurricane Mat

2 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineer’s dredger Currituck will next week begin the Ponce de Leon Inlet maintenance dredging project.

According to the Corps, the maintenance dredging of the inlet is scheduled to begin April 11 and provides an interim solution to sand deposited in the inlet by Hurricane Matthew.

The project will remove approximately 130,000 cubic yards of material in the vicinity of the U.S. Coast Guard Buoy R8B in the Ponce de Leon Inlet. The sand will be placed in the nearshore, off New Smyrna Beach, south of the inlet.

The Corps’ Currituck is to complete the work by May 15, keeping the channel open for safe navigation for as long as possible through summer 2017.

USACE intends to combine a more robust dredging of the Ponce de Leon Inlet with dredging of the Intracoastal Waterway (IWW), in the vicinity of the Ponce de Leon Inlet later this year – with plans to issue a solicitation in September for bids from small businesses to dredge in the winter and spring 2018, reported the Corps Jacksonville District.

The sand from the consolidated project will be placed in the nearshore of New Smyrna Beach via the covered Sapphire Road cross-island pipe.

The Corps added that consolidating these dredging projects is anticipated to result in a cost savings of $1 million to $1.5 million. Placement of the dredged material in the nearshore of New Smyrna Beach brings dredging and coastal protection together through regional sediment management (RSM).

The mission of RSM is to use sand or sediment that is necessary to be dredged from navigation channels and places it on or near shorelines to renourish beaches and provide coastal protection.

[mappress mapid=”23859″]

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & FinanceVessels

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

PHOTO OF THE DAY: Maldon Harbor dredging in full swing
Business development

PHOTO OF THE DAY: Maldon Harbor dredging in full swing

14 days ago

Tender launched for Gioia Tauro dredging
Business development

Tender launched for Gioia Tauro dredging

15 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

PHOTO OF THE DAY: Maldon Harbor dredging in full swing
Business development

PHOTO OF THE DAY: Maldon Harbor dredging in full swing

14 days ago
Tender launched for Gioia Tauro dredging
Business development

Tender launched for Gioia Tauro dredging

15 days ago