DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Florida Dredge and Dock Kicks Off Banana River Dredging
Business & Finance

April 12, 2017 · about 9 years ago

Florida Dredge and Dock Kicks Off Banana River Dredging

The U.S. Army Corps of Engineers, Jacksonville District, said that Florida Dredge and Dock (FDD) started hydraulic dredging operations yesterday in a portion of the Banana River, known as Cut 13. Cut 13 begins just North of the bridge where 528 (The Bee Line) crosses Banana River and extends north a

1 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers, Jacksonville District, said that Florida Dredge and Dock (FDD) started hydraulic dredging operations yesterday in a portion of the Banana River, known as Cut 13.

Cut 13 begins just North of the bridge where 528 (The Bee Line) crosses Banana River and extends north approximately 14,000 ft.

FDD will also be dredging a small area of the Canaveral Barge Canal just north of 528 and immediately West of the Canaveral Locks, as well as a small area of Kar’s Park access channel, which intersects cut 13 approximately 9,400 ft. north of the Canaveral Barge Canal.

“There will be floating and submerged pipeline running from the dredge towards the spoil site that is located directly west of the intersection of Cut 13 and Cut 14. There will also be a booster and support equipment present during portions of the project,” USACE said.

Construction will take place during daylight hours 7 days/week, but equipment and pipeline will remain on site during evening hours.

The dredging program is set to last until approximately 1 September 2017.

[mappress mapid=”23908″]

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free