DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Sandbridge Beach Restoration Project Wins ASBPA Award
Business & Finance

May 29, 2017 · about 9 years ago

Sandbridge Beach Restoration Project Wins ASBPA Award

The Sandbridge Beach Restoration Project has been named by the American Shore and Beach Preservation Association (ASBPA) as one of the beast restored beaches for 2017. This renourishment project is located in the city of Virginia Beach and has been re-nourished four times since 1998. An estimated 7.

1 minutes read
  • LinkedIn
  • X
  • Email

The Sandbridge Beach Restoration Project has been named by the American Shore and Beach Preservation Association (ASBPA) as one of the beast restored beaches for 2017.

This renourishment project is located in the city of Virginia Beach and has been re-nourished four times since 1998. An estimated 7.8 million cubic yards of sand have been placed on five miles of beach with a total cost of $43.8 million.

“This project shows how a town, private landowners and the U.S. Army Corps of Engineers can come together to protect houses; and that a community can find creative ways to fund their share of the project by creating a local tax district. The community could have armored the shoreline with higher seawalls and rip-rap, but choose instead to undertake a beach nourishment project to restore their beach,” ASBPA said in its release.

The restored beach has increased the coastal resiliency of this shore while returning much needed sand to the littoral system.

Prior to the restoration, there was no high-tide beach along this section of shoreline. The residents and the city proactively worked with the USACE to develop a federal project that not only restored the beach and dune ecosystem but dramatically reduced property damage and loss from severe storms.

[mappress mapid=”24123″]

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free