Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Dragflow Proves Success in Brazil
Business & Finance

May 31, 2017 · about 9 years ago

Dragflow Proves Success in Brazil

Dragflow, an Italian manufacturer of heavy duty pumps and complete dredging equipment, has successfully completed a tailings pond dredging job at an iron mine in Brazil. Dragflow was called to face with the problem of dredging and returning the tailings back to a ‘Mineral Duct’. In addition, it was

2 minutes read
  • LinkedIn
  • X
  • Email

Dragflow, an Italian manufacturer of heavy duty pumps and complete dredging equipment, has successfully completed a tailings pond dredging job at an iron mine in Brazil.

Dragflow was called to face with the problem of dredging and returning the tailings back to a ‘Mineral Duct’.

In addition, it was crucial for the project to maintain the maximum capacity of the pond in order to be always ready to deal with any emergency situation, said Dragflow.

The tailings have a high content of Iron with specific gravity up to 4,9 kg/dm³ so only a super duty dredging pump with an oversize motor could do the job.

Problem and solution

Dragflow found the perfect solution supplying a DRH85/180E22 dredger equipped with the submergible dredging unit: Hydraulic Pump HY85/180A plus two Hydraulic Excavators EXHY20 and a high pressure Jet-Ring System.

This piece of dredging equipment can be operated by one operator working inside the control cabin or directly from the shore through a wireless joystick with no operator aboard, said Dragflow.

The iron ore, mixed with water, is pumped from the mine to the shore for more than 500 km through the ‘Mineral Duct’. Once the mineral arrives to the port terminal on the coast, it gets separated from the water and loaded on barges for ocean transportation.

Along the pipeline there are some booster stations and speed control valves that sometimes have to be put under maintenance. In this event it gets urgent to stop the pumping to the shore and to divert the material coming from the plant toward a tailing pond.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & FinanceEquipmentTechnology

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

14 days ago

Marinex wins Brunswick dredging contract
Business development

Marinex wins Brunswick dredging contract

14 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

14 days ago
Marinex wins Brunswick dredging contract
Business development

Marinex wins Brunswick dredging contract

14 days ago