DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Solana Beach Coastal Protection Plan on Display
Business & Finance

June 12, 2017 · about 9 years ago

Solana Beach Coastal Protection Plan on Display

The U.S. Army Corps of Engineers, Los Angeles District, is inviting comments on a proposed shoreline stabilization project which includes a 140 foot long by 20 foot wide concrete seawall along the bluffs and coastline in the City of Solana Beach, California. “The development would protect the above

1 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers, Los Angeles District, is inviting comments on a proposed shoreline stabilization project which includes a 140 foot long by 20 foot wide concrete seawall along the bluffs and coastline in the City of Solana Beach, California.

“The development would protect the above residential properties and would be located on city-owned beach open to the public and the city-owned bluff face of an 80 ft.-high coastal bluff fronting two existing single family residences at 517 and 521 Pacific Avenue Shoreline Stabilization Project,” USACE said in its announcement.

The upland bluff behind the 521 residence also includes a planting plan on the bluff above the seawall.

This project is intended to cover the exposed bluff in order to prevent further erosion of supportive bluff material that could lead to bluff failure and potential public safety issues from bluff failures.

The decision whether to issue a permit for this coastal scheme will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest.

Comment period ends July 10, 2017.

[mappress mapid=”24181″]

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free