Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Rossall Sea Defenses June Update
Business & Finance

June 21, 2017 · about 9 years ago

Rossall Sea Defenses June Update

With the November end date fast approaching, works continue to focus on filling some large gaps in the new sea defenses at Rossall. The bridging structure over the United Utilities twin outfalls is progressing slowly but surely, reported the Wyre Council. All 30 tubular steel piles have been driven

2 minutes read
  • LinkedIn
  • X
  • Email

With the November end date fast approaching, works continue to focus on filling some large gaps in the new sea defenses at Rossall.

The bridging structure over the United Utilities twin outfalls is progressing slowly but surely, reported the Wyre Council.

All 30 tubular steel piles have been driven into the beach with all the steel beams spanning between them installed, most now encased in concrete.

The reinforced concrete slab which spans between the beams is now being cast. All of this will support the new sea defenses above without imposing any load on the outfalls.

According to the report, two of the three vehicular/pedestrian access ramps which run from the upper promenade all the way down to the beach have now been completed with work started on the third.

At each of the 18 groynes, a ramp provides access over it and to the beach access steps. Work to install a large precast edging kerb and a finished slab to the base of the steps and ramps is underway, currently to 9 of the 18 ramps.

As part of the project the crews are also building an ecology park to the rear of the sea defenses. Initially this involves recontouring the land up towards the rear wall to reduce the visual impact of the concrete wall so that only 1.1 meters (handrail height) is visible.

This requires the import of 90,000 tonnes of material to raise land levels. Over the period the crews have started work importing/placing material and topsoiling at the southern end of the scheme.

Other work carried out to date includes placing of golden quartz promenade slabs, joint sealing promenade slabs, completion of precast concrete revetment units, wave wall units and heel slabs around two completed beach access ramps and work that will tie in the new to the existing defenses at both the north and south ends.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & FinanceProject & Tenders

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Port of Vancouver: Dredging work at Second Narrows set for September
Business development

Port of Vancouver: Dredging work at Second Narrows set for September

about 1 month ago

United States to fund construction of Poti Seaport’s new berth
Berth Expansion

United States to fund construction of Poti Seaport’s new berth

about 1 month ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Port of Vancouver: Dredging work at Second Narrows set for September
Business development

Port of Vancouver: Dredging work at Second Narrows set for September

about 1 month ago
United States to fund construction of Poti Seaport’s new berth
Berth Expansion

United States to fund construction of Poti Seaport’s new berth

about 1 month ago