DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Bids Invited for South Entrance Beach Project
Business & Finance

July 4, 2017 · about 9 years ago

Bids Invited for South Entrance Beach Project

The NSW Government is calling for tenders for the construction of a rock groyne to control erosion at South Entrance beach. Parliamentary Secretary for the Central Coast, Scot MacDonald MLC, said that the NSW Government has allocated $2 million to the project to increase the length of time that sand

1 minutes read
  • LinkedIn
  • X
  • Email

The NSW Government is calling for tenders for the construction of a rock groyne to control erosion at South Entrance beach.

Parliamentary Secretary for the Central Coast, Scot MacDonald MLC, said that the NSW Government has allocated $2 million to the project to increase the length of time that sand stays on the beach at The Entrance.

“The 100 meter long rock groyne will be constructed south of the Surf Life Saving Club tower and have a direct benefit for the entrance channel to Tuggerah Lakes and recreational beachgoers,” Mr MacDonald said.

“Work will involve the placement of around 6,000 tonnes of 2 to 4 tonne size rocks which will be transported by dump trucks to the site.”

The project will be managed by the Department of Industry (DoI) – Lands & Forestry and will also involve nourishment of the beach with sand dredged from the entrance channel and the completion of a report into making the channel deeper.

The call for tenders today follows extensive community consultation and a thorough review of environmental factors including local vegetation, fauna, traffic management, site safety, noise pollution, water quality and waste management.

Work is expected to be completed by the end of 2017.

[mappress mapid=”24248″]

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free