DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Kenai Bluffs Bank Stabilization Study on Display
Business & Finance

July 5, 2017 · about 9 years ago

Kenai Bluffs Bank Stabilization Study on Display

Representatives with the U.S. Army Corps of Engineers’ Alaska District will conduct a public meeting about the Kenai Bluffs Bank Stabilization Section 116 feasibility study. The meeting will take place at 6 p.m. today at the Kenai Visitor and Cultural Center, USACE said. The Corps has prepared a dra

1 minutes read
  • LinkedIn
  • X
  • Email

Representatives with the U.S. Army Corps of Engineers’ Alaska District will conduct a public meeting about the Kenai Bluffs Bank Stabilization Section 116 feasibility study.

The meeting will take place at 6 p.m. today at the Kenai Visitor and Cultural Center, USACE said.

The Corps has prepared a draft integrated feasibility report, environmental assessment and draft Finding of No Significant Impact, or FONSI, for the study.

The project consists of constructing a berm about 5,000 feet long below the Kenai Bluffs toe. It is designed to prevent flood tides from washing away material that collects at the bluff toe and coastal storms from eroding the lower portion of the bluff.

As the material accumulates between the berm and toe of the bluff, the bluff face will be left to erode back naturally to a more stable slope, which is estimated to take up to 15 years.

The proposed project description and potential environmental impacts are available for public review and comment for 30 days from the date of this notice, USACE said.

[mappress mapid=”24217″]

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free