Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Bakker Sliedrecht to Deliver Electrical Power Plant for Spartacus
Business & Finance

July 10, 2017 · about 9 years ago

Bakker Sliedrecht to Deliver Electrical Power Plant for Spartacus

Bakker Sliedrecht has been awarded a contract for the engineering, delivery and commissioning of the electrical power plant and auxiliary electrical installations for the world’s most powerful cutter suction dredger (CSD) Spartacus. This giant dredging vessel, to be fueled by liquefied natural gas (

1 minutes read
  • LinkedIn
  • X
  • Email

Bakker Sliedrecht has been awarded a contract for the engineering, delivery and commissioning of the electrical power plant and auxiliary electrical installations for the world’s most powerful cutter suction dredger (CSD) Spartacus.

This giant dredging vessel, to be fueled by liquefied natural gas (LNG), is being built by Royal IHC on behalf of Belgium based Dredging International (DEME).

With a total installed power of 44.180 kW, the Spartacus will be the most powerful cutter suction dredger that has ever been built. The vessel’s power will enable her to cut harder soils at speeds that have not been possible before, Bakker said.

“Bakker Sliedrecht is responsible for delivering the power electrical plant that will generate and distribute power throughout the CSD. We are also responsible for the integration of the entire electrical installation,” the company said in its release.

Highlights of Bakker’s scope of work are:

The Spartacus will be equipped with the brand-new ABB ACS 880 liquid-cooled low voltage multidrive system.

“The new model of ABB has a very high power density, yielding a lot of power out of a small footprint. The ABB ACS 880 is maintenance friendly and already compliant with future regulations,” according to Bakker.

The Spartacus will be delivered to DEME in 2019.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & FinanceEquipmentTechnologyVessels

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

13 days ago

Marinex wins Brunswick dredging contract
Business development

Marinex wins Brunswick dredging contract

14 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

13 days ago
Marinex wins Brunswick dredging contract
Business development

Marinex wins Brunswick dredging contract

14 days ago