DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›New Sand for Ocean City Beaches
Business & Finance

July 12, 2017 · about 9 years ago

New Sand for Ocean City Beaches

The U.S. Army Corps of Engineers, Baltimore District, has just announced more details about recently awarded beach renourishment project in Ocean City, Maryland. The $12.7 million renourishment scheme, to be conducted by Great Lakes Dredge & Dock Company (GLDD), will involve the placement of roughly

2 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers, Baltimore District, has just announced more details about recently awarded beach renourishment project in Ocean City, Maryland.

The $12.7 million renourishment scheme, to be conducted by Great Lakes Dredge & Dock Company (GLDD), will involve the placement of roughly 900,000 cubic yards of sand on the beach at Ocean City to restore the engineered beach berm to its full design elevation.

Work on the beach is expected to begin sometime after the Labor Day holiday, said USACE.

The beach berm, which is the wide, flat beach in front of the boardwalk and dunes, is an engineered beach that is an element of the overall coastal storm risk management project at Ocean City.

“Most people may not realize it, but the beach at Ocean City enjoyed by so many visitors is actually an engineered beach that is designed to be part of a system to reduce coastal storm damages,” said Project Manager Justin Callahan.

“This renourishment is an important part of the long-term commitment to maintaining this coastal storm risk management project and we’re delighted to be able to begin work later this year.”

The coastal storm risk management project at Ocean City consists primarily of the 8-plus mile-long wide, flat beach berm constructed to 7 feet above mean high tide, backstopped by a concrete-capped steel sheet pile bulkhead along the boardwalk and a vegetated sand dune north of the boardwalk to the Maryland-Delaware state line.

Renourishment of the beach is part of the long-term construction schedule of the coastal storm risk management project. It is generally carried out every four years, but will begin ahead of schedule this year to repair the impacts to the project from the January 2016 storm often referred to as Winter Storm Jonas.

[mappress mapid=”24277″]

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free