Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›South Forty Foot Drain Dredging VIDEO
Business & Finance

August 4, 2017 · about 9 years ago

South Forty Foot Drain Dredging VIDEO

Association of Drainage Authorities announced yesterday that the Black Sluice IDB has just completed initial works with the Environment Agency using a small scale cutter suction dredger provided by Smals Dredging UK Ltd to carefully remove silt deposits from the bed of the South Forty Foot Drain, ne

1 minutes read
  • LinkedIn
  • X
  • Email

Association of Drainage Authorities announced yesterday that the Black Sluice IDB has just completed initial works with the Environment Agency using a small scale cutter suction dredger provided by Smals Dredging UK Ltd to carefully remove silt deposits from the bed of the South Forty Foot Drain, near Boston in Lincolnshire.

The aim of the work was to restore the capacity of the channel within the 17th century raised bank main river to improve conveyance.

This first phase of works took place over 7.5km of channel between Neslam Bridge and the Board’s Black Hole Drove Pumping Station and the future intention is to continue this work through to the A17 Swineshead Bridge.

Silt was pumped up to 3km through pipes floating in the channel to two dewatering areas constructed on adjacent farmland.

As part of the project the IDB and Smals Dredging recently held an open event to explain the specialist technique being used to other flood risk management authorities and the general public.

During the works, a specialist 45 ton long reach excavator worked in tandem with a smaller spider excavator. This machine could ‘walk’ its way along the bottom of the riverbed and pass extensive root growth and blanket weed it had collected to the larger machine in order to remove it from the river bed.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & FinanceProject & Tenders

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Port of Vancouver: Dredging work at Second Narrows set for September
Business development

Port of Vancouver: Dredging work at Second Narrows set for September

about 1 month ago

United States to fund construction of Poti Seaport’s new berth
Berth Expansion

United States to fund construction of Poti Seaport’s new berth

about 1 month ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Port of Vancouver: Dredging work at Second Narrows set for September
Business development

Port of Vancouver: Dredging work at Second Narrows set for September

about 1 month ago
United States to fund construction of Poti Seaport’s new berth
Berth Expansion

United States to fund construction of Poti Seaport’s new berth

about 1 month ago