DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›The City Calls for Maintenance Dredging of Bass River
Business & Finance

August 31, 2017 · about 9 years ago

The City Calls for Maintenance Dredging of Bass River

The City of Beverly has submitted a permit application to conduct maintenance dredging in the Bass River, reports the U.S. Army Corps of Engineers, New England District. The work involves mechanical dredging of 17.8 acres of silt and clay within the Bass River in two phases. Phase I will include are

1 minutes read
  • LinkedIn
  • X
  • Email

The City of Beverly has submitted a permit application to conduct maintenance dredging in the Bass River, reports the U.S. Army Corps of Engineers, New England District.

The work involves mechanical dredging of 17.8 acres of silt and clay within the Bass River in two phases.

Phase I will include areas of the Bass River from Bridge Street northward to areas just beyond the Bass Haven Yacht Club. Phase I will dredge this 315,005 square foot area to a depth of -6 mean low water with a one foot over dredge and will remove a total of 53,800 cubic yards of material.

Phase II will include areas of the Bass River from Bridge Street southward to the confluence of the Bass River and the Danvers River. Phase II will dredge a 462,300 square foot area to a depth of -9 mean low water with a one foot over dredge and will remove 50,500 cubic yards of material.

According to the Corps, a total of 104,300 cubic yards of silt and clay material will be removed from the Bass River and disposed of at the Massachusetts Bay Disposal Site.

The project will also include storm water improvements, removal of storm sediment, shoreline cleanup and revetment construction at Bass Haven Yacht Club.

The deadline for sending comments on the proposed work is September 30, 2017.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free