Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Myrtle Beach Project Update
Business & Finance

September 8, 2017 · about 9 years ago

Myrtle Beach Project Update

The Myrtle Beach Storm Damage Reduction Project has been temporarily stopped as Hurricane Irma heads towards South Carolina. According to the U.S. Army Corps of Engineers, Charleston District renourishment update, Great Lakes Dredge and Dock has stopped pumping and dredging and is preparing the dred

1 minutes read
  • LinkedIn
  • X
  • Email

The Myrtle Beach Storm Damage Reduction Project has been temporarily stopped as Hurricane Irma heads towards South Carolina.

According to the U.S. Army Corps of Engineers, Charleston District renourishment update, Great Lakes Dredge and Dock has stopped pumping and dredging and is preparing the dredges to be sent to safe harbor.

GLDD is working to get all of the pipes and equipment off the beach by the end of the weekend and will survey the beach prior to evacuating.

“ Safety is the Charleston District’s number one priority ,” said Lt. Col. Jeffrey Palazzini. “ By preparing now, we will ensure that everyone is safely evacuated and that the equipment is safely secured so it won’t cause any damage .”

Post-storm the Corps will perform an initial assessment of the beach to document any sand loss from the project. Once the project is completed, the Corps will survey the beach to asses if there was any significant erosion due to Hurricane Irma during construction.

If erosion did occur, sand replacement would depend on funding and contractor availability. Once the storm has passed, the contractor plans to continue pumping and dredging where the project left off before their orderly shutdown on 8th Ave South, reported the Corps.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & FinanceProject & Tenders

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Port of Vancouver: Dredging work at Second Narrows set for September
Business development

Port of Vancouver: Dredging work at Second Narrows set for September

about 1 month ago

United States to fund construction of Poti Seaport’s new berth
Berth Expansion

United States to fund construction of Poti Seaport’s new berth

about 1 month ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Port of Vancouver: Dredging work at Second Narrows set for September
Business development

Port of Vancouver: Dredging work at Second Narrows set for September

about 1 month ago
United States to fund construction of Poti Seaport’s new berth
Berth Expansion

United States to fund construction of Poti Seaport’s new berth

about 1 month ago