DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Dredge Yard Bags ECO200 Dredger Order
Business & Finance

September 19, 2017 · about 9 years ago

Dredge Yard Bags ECO200 Dredger Order

Dredge Yard recently signed a contract to design, manufacture and deliver an ECO200 Dredger with auger head. The auger dredger will have a dredging depth of 6m and will come with a 1500m discharge pipeline. According to the company, the ECO200 Auger will be delivered to a mining corporation in West-

1 minutes read
  • LinkedIn
  • X
  • Email

Dredge Yard recently signed a contract to design, manufacture and deliver an ECO200 Dredger with auger head.

The auger dredger will have a dredging depth of 6m and will come with a 1500m discharge pipeline.

According to the company, the ECO200 Auger will be delivered to a mining corporation in West-Africa.

There the ECO200 will be used for mining activities in a shallow river where the removed sand & gravel is then processed to capture gold and diamonds.

The economic auger head is designed to excavate with minimum spillage and provide the best suction performance. For this project, Dredge Yard is going to install small extended knifes on the auger.

The objective of these knifes is to loosen the compacted river sands to be transported by the screw motion of the auger to the suction mouth. Sufficient pumping power is provided to transport the dredged material over a discharge length of more than 1500m.

The ECO200 Dredger will be built out of two main pontoons. This will provide sufficient floating capacity, but maintaining a shallow draft of around 0.8m.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free