DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Manhattan Coastal Protection Deal for Arcadis
Business & Finance

September 24, 2017 · about 9 years ago

Manhattan Coastal Protection Deal for Arcadis

Arcadis today announced its selection as Engineer of Record for the Federal Emergency Management Agency (FEMA) flood protection multiphase design of New York City’s East Side Coastal Resiliency (ESCR) Project in the borough of Manhattan. Arcadis is part of a team supporting New York City’s efforts t

1 minutes read
  • LinkedIn
  • X
  • Email

Arcadis today announced its selection as Engineer of Record for the Federal Emergency Management Agency (FEMA) flood protection multiphase design of New York City’s East Side Coastal Resiliency (ESCR) Project in the borough of Manhattan.

Arcadis is part of a team supporting New York City’s efforts to safeguard the Lower East Side against severe weather events and continued sea level rise.

The ESCR Project, led by the Mayor’s Office of Recovery and Resiliency, is an urban flood protection solution spanning 2.5 miles of Lower Manhattan, including the East Side, and is the first element of coastal storm and sea leave rise defense system for the East Side and Lower Manhattan.

“New York City is particularly vulnerable to the effects of sea level rise as proven by Hurricane Sandy’s economic impacts on the city’s dense population and business centers as well as underground infrastructure,” said Peter Glus, Arcadis City Executive for New York City .

“Our team brings a wealth of expertise in climate change adaptability and resilience from our Dutch heritage and from our experienced engineers who designed flood protection systems across the Louisiana coast following Hurricane Katrina.”

Following completion of ESCR’s conceptual design and preliminary design phases, Arcadis was selected as part of a multi-disciplined engineering team contracted by the New York City Department of Design and Construction during final design phase of the project.

[mappress mapid=”24435″]

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free