Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Damen DOP 250 Proves Success in Brazil
Business & Finance

September 27, 2017 · about 8 years ago

Damen DOP 250 Proves Success in Brazil

Veracel Celulose, a Brazilian company involved in the forestry and pulp mill businesses, has found Damen in their quest for a solution to keep their Belmonte maritime terminal at sufficient water depth. Jointly Veracel and Damen evaluated the situation on site and developed a solution to maintain th

2 minutes read
  • LinkedIn
  • X
  • Email

Veracel Celulose, a Brazilian company involved in the forestry and pulp mill businesses, has found Damen in their quest for a solution to keep their Belmonte maritime terminal at sufficient water depth.

Jointly Veracel and Damen evaluated the situation on site and developed a solution to maintain the terminal water depth.

The solution was a combination of a submersible dredge pump, type DOP 250, and a Booster station, type BS 250. To improve the dredging efficiency the DOP Pump is equipped with a mining head fitted out with jet water nozzles, specially designed to loosen the sand.

The pressurized water is delivered to the nozzles by a separate diesel driven jet water set. The DOP 250 pumps the dredged material over a distance of 450m to the Booster Station, which than transports the mixture for another 800m to the desired discharge location.

“Besides the equipment Damen delivered an extensive training and commissioning package performed by one of Damen’s dredge masters assisted by the technicians of the Rio de Janeiro based Damen Service Hub. The training enabled Veracel to fully use and maintain their equipment within two weeks after delivery. The Service Hub in Rio ensures Veracel of 24/7 service to their equipment when needed,” Damen said in its release.

Veracel has ordered a Production Measuring Unit as an add-on to their equipment. The PMU will enable Veracel to real time measure the dry sand production which will help to increase efficiency even further. The PMU has been enhanced to be used in Veracel’s remote equipment monitoring system, Damen said.

[mappress mapid=”24451″]

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & FinanceEquipmentTechnology

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

13 days ago

Marinex wins Brunswick dredging contract
Business development

Marinex wins Brunswick dredging contract

14 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

13 days ago
Marinex wins Brunswick dredging contract
Business development

Marinex wins Brunswick dredging contract

14 days ago