DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Nieuwe Waterweg Dredging Set for Spring 2018
Business & Finance

October 3, 2017 · about 8 years ago

Nieuwe Waterweg Dredging Set for Spring 2018

The Directorate – General for Public Works and Water Management (Rijkswaterstaat) and the Port of Rotterdam Authority have unveiled their plans to dredge the Nieuwe Waterweg and the Botlek in the spring of 2018. A tender for this dredging scheme, set to last around six months, was issued earlier thi

2 minutes read
  • LinkedIn
  • X
  • Email

The Directorate – General for Public Works and Water Management (Rijkswaterstaat) and the Port of Rotterdam Authority have unveiled their plans to dredge the Nieuwe Waterweg and the Botlek in the spring of 2018.

A tender for this dredging scheme, set to last around six months, was issued earlier this week.

The work will involve a significant amount of dredging work along a 25-kilometer stretch of waterway between Hoek van Holland, the Benelux Tunnel and the Botlek Port.

“Medium-sized tankers and dry bulk carriers are getting bigger. The deepening will allow the New Panamax and Aframax ships to navigate the Nieuwe Waterweg without any restrictions,” according to Willy Dekker, Network Director at Rijkswaterstaat.

“To maintain the vitality of port industry in the Botlek, we need to invest in the preservation and renewal of this old port area,” said Ronald Paul, COO at the Port Authority.

Deepening

The deepening will encompass three different contract depths.

The depth of the Botlek will go from ≈ 14.5 m (New Amsterdam Water Level (NAP)) to ≈ 15.90 m. Along the Nieuwe Waterweg, the first stretch from Hoek van Holland to Maassluis will de deepened from ≈ 15m to ≈ 16.20m.

The second section up to the Benelux Tunnel will have a guaranteed depth of ≈ 16.40m. It used to be ≈ 14.5m.

The additional 20 centimeters are connected to the lower salt content in the Nieuwe Waterweg which means ships need a greater water depth.

After the deepening, ships with a draught of 15 meters will be able to sail into the harbor under normal circumstances. Ships with a draught of 14.90 meters can already sail through the new Panama Canal, so New Panamax ships will be able to reach the Botlek without any restrictions.

[mappress mapid=”24477″]

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free