DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Martha’s Vineyard Scheme up for Comment
Business & Finance

October 11, 2017 · about 8 years ago

Martha’s Vineyard Scheme up for Comment

The Wampanoag Tribe of Gay Head, in Aquinnah, is seeking a permit from the U.S. Army Corps of Engineers, New England District, to dredge Herring Creek and do other work on Martha’s Vineyard, Mass. According to the Corps, the work is proposed on and adjacent to Tribal Trust Land off of State Road in

1 minutes read
  • LinkedIn
  • X
  • Email

The Wampanoag Tribe of Gay Head, in Aquinnah, is seeking a permit from the U.S. Army Corps of Engineers, New England District, to dredge Herring Creek and do other work on Martha’s Vineyard, Mass.

According to the Corps, the work is proposed on and adjacent to Tribal Trust Land off of State Road in Aquinnah, and throughout the entirety of the waters of Herring Creek from Menemsha Pond to Squibnocket Pond in Aquinnah.

The proposed work involves dredging of Herring Creek to depths between -1.5 feet and -2 feet mean lower low water (MLLW) in the stream and -7 feet MLLW in the pools from the existing grades which range from 0.5 feet to 2 feet MLLW in the stream and -3.5 feet MLLW within the pools.

The Tribe will hydraulically dredge approximately 1,300 cubic yards from a 20,000-square-foot area within Herring Creek from Menemsha Pond to Squibnocket Pond.

The dredged material will be dewatered on site in an approximately 1,200-square-foot upland area allowing excess water to flow back into Herring Creek and then transported to uplands on tribal property.

Deadline for sending comments on the proposed work is November 9, 2017.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free