DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›USACE Marks End of Hammond Levee Tieback Project
Business & Finance

October 15, 2017 · about 8 years ago

USACE Marks End of Hammond Levee Tieback Project

The U.S. Army Corps of Engineers’ Chicago District, Rep. Pete Visclosky, the Little Calumet River Basin Development Commission and the city of Hammomd held a ribbon-cutting ceremony last week to mark the completion of the levee tieback project in Hammond, Ind. “The Commission, as local sponsor, has

2 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers’ Chicago District, Rep. Pete Visclosky, the Little Calumet River Basin Development Commission and the city of Hammomd held a ribbon-cutting ceremony last week to mark the completion of the levee tieback project in Hammond, Ind.

“ The Commission, as local sponsor, has and will continue to take great pride in solving problems inherited since the flood of 2008. The completion of this work marks the last USACE construction project along the flood control system. The State Line Tieback will provide yet another level of protection for a significant number of residents in this area of the watershed,” said William Baker, Chairman, Little Calumet River Basin Development Commission.

The project, along portions of 172nd Street and Stateline Road, increased the existing 1,950 foot concrete tieback levee and tied it into an existing earthen levee constructed to a 200-year flood elevation.

The work also included building an access ramp to the top of the existing levee, permanently closing some of the gaps, and modifying the two remaining openings to have stop log closures.

“The Hammond Levee Tieback project is the last structural feature of the Little Calumet River project. The Hammond Forest Ave Levee reduces the frequency of flooding for approximately 200 structures (valued at $50 million) and 400 residents within the leveed area,” said Col. Aaron Reisinger, commander, U.S. Army Corps of Engineers, Chicago District.

The construction contract was awarded to DSI & Associates on September 30, 2016 for $582,384.70, USACE said.

Field construction work started March 27, 2017.

[mappress mapid=”24498″]

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free