DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Jan De Nul: Amador Cruise Port Scheme Kicks Off
Business & Finance

October 19, 2017 · about 8 years ago

Jan De Nul: Amador Cruise Port Scheme Kicks Off

The Panama Maritime Authority (AMP) yesterday held a kick-off ceremony for the construction of the new Amador Cruise Port, Jan De Nul said in their latest announcement. A complete new cruise terminal at the Pacific Side of Panama will be built over the next 18 months. The design and construction of

2 minutes read
  • LinkedIn
  • X
  • Email

The Panama Maritime Authority (AMP) yesterday held a kick-off ceremony for the construction of the new Amador Cruise Port, Jan De Nul said in their latest announcement.

A complete new cruise terminal at the Pacific Side of Panama will be built over the next 18 months.

The design and construction of the Amador cruise terminal, at Perico Island, was formally awarded by the AMP to the consortium Cruceros del Pacifico, integrated by Jan De Nul Panama SA and China Harbor Engineering Company (CHEC).

As a member of the consortium, Jan De Nul Panama SA will take care of all dredging and land reclamation works as required for the construction and operation of the terminal.

This includes dredging the berth pocket, turning basin and access channel with a backhoe dredger and trailing suction hopper dredger.

A trailing suction hopper dredger will also be deployed to dredge and transport sand from a borrow area and reclaim an area of 8.3 hectares for the construction of all land based facilities.

“ This infrastructure project is key to boost Panama’s economic development, ” Juan Carlos Varela, President of the Republic of Panama , said. “It will generate a thousand direct jobs and 1,800 indirect jobs during its construction phase, as well as permanent employees for the operation of the terminal. All this will have a positive impact on the Panamanian economy and on the homes of each of those workers who will be part of this great work.”

The new cruise terminal will have two docks in which two cruise ships with a capacity of up to five thousand passengers each (Oasis class) can berth simultaneously.

[mappress mapid=”24521″]

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free