DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Ohio River Dam 52 Back in Business
Business & Finance

October 19, 2017 · about 8 years ago

Ohio River Dam 52 Back in Business

After intermittent closures at U.S. Army Corps of Engineers Locks and Dam 52, Brookport, Illinois, the main lock chamber is now back in service and open to navigation traffic, according to to the latest U.S. Army’s release. Locks and Dams 52 is a low lift wicket dam built in 1928 consisting of 487 t

2 minutes read
  • LinkedIn
  • X
  • Email

After intermittent closures at U.S. Army Corps of Engineers Locks and Dam 52, Brookport, Illinois, the main lock chamber is now back in service and open to navigation traffic, according to to the latest U.S. Army’s release.

Locks and Dams 52 is a low lift wicket dam built in 1928 consisting of 487 timber and steel wicket gates adjacent to one another stretching the width of the Ohio River at mile marker 938.9.

During periods of high water navigation traffic transits over the lowered wicket gates, but during low water, the gates must be raised individually to impound water creating a navigable depth from Locks and Dam 52 to Smithland Locks and Dam, Kentucky Lake and Lake Barkley.

The first closure took place from September 6-14, 2017, the official announcement said.

The navigation pass was closed to navigation traffic while project personnel raised the wicket dam. During the raising event there was a five-wicket hole encountered.

Due to the increased velocity around the end of the dam, project personnel were unable to continue raising the wickets.

As the river elevations fell, and with decreased water velocity, project personnel were successful in raising wickets beyond the hole. Once the wickets were raised and a navigable pool was impounded, navigation traffic began to use the lock chambers.

To aid in repairs, a rock dike was constructed above the wicket hole in the navigation pass of the wicket dam.

The second closure was from October 8-14. Due to the rise of the river, the wicket dam was over-topped and the maximum locking elevation was reached on October 8. River elevations returned to an appropriate elevation to resume locking on October 14.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free