Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Subcon Wins Sino Iron Terminal Deal
Business & Finance

November 2, 2017 · about 8 years ago

Subcon Wins Sino Iron Terminal Deal

Subcon has been awarded by Citic Pacific Mining (CPM) a contract for the design and supply of their scour systems for berth pocket stabilization at the Sino Iron Terminal at Port of Cape Preston. “The larger vessel size and deeper berth pocket means increases in bow thruster and main propeller wash

2 minutes read
  • LinkedIn
  • X
  • Email

Subcon has been awarded by Citic Pacific Mining (CPM) a contract for the design and supply of their scour systems for berth pocket stabilization at the Sino Iron Terminal at Port of Cape Preston.

“The larger vessel size and deeper berth pocket means increases in bow thruster and main propeller wash velocities pose a significant scour erosion risk to the existing breakwater rock armor, ” said Subcon in its release.

CPM approached Subcon to design, manufacture and supply a retro fit, low to no maintenance, high performance scour protection solution to protect the breakwater at the location of the vessel’s bow thruster and main propeller as well as shield the seafloor at the toe of the embankment.

Subcon is currently fabricating a total of 203 scour protection mattresses at its Karratha facility.

“ The design includes a combination of our CoastMattTM and plastic mould articulated concrete mattress products ,” said Subcon.

The mattresses incorporate an industry first superduplex stainless steel rope to achieve the low maintenance requirement in the highly corrosive environment.

Port of Cape Preston

CPM exports a magnetite concentrate via its a purpose-built terminal at Port of Cape Preston which is located approximately 60 kilometers south-west of Dampier.

The existing facility was built to accommodate a trans-shipping method of transporting the magnetite concentrate which entailed loading the material onto multiple hopper barges at the terminal berth before the barges were towed out and the ore discharged into a larger ocean going vessel waiting offshore for shipping to buyers.

To increase the material throughput of the terminal, CPM has decided to utilize a larger, self-discharging, self-propelled vessel for trans-shipping.

Preliminary enabling works to facilitate this change were conducted at the terminal earlier this year which consisted of dredging the existing berth, removing existing stop dolphin and upgrading vessel moorings.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & FinanceEquipmentTechnology

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Marinex wins Brunswick dredging contract
Business development

Marinex wins Brunswick dredging contract

14 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Marinex wins Brunswick dredging contract
Business development

Marinex wins Brunswick dredging contract

14 days ago