Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Norfolk Dredging Secures Craney Island Expansion Contract
Business & Finance

November 6, 2017 · about 8 years ago

Norfolk Dredging Secures Craney Island Expansion Contract

Norfolk Dredging of Chesapeake, Virginia, last Friday won a $9.65 million Craney Island Eastward Expansion contract. The contract – awarded by the U.S. Army Corps of Engineers, Norfolk District – calls for the mechanical dredging of the top layer of soil material, including debris, to a depth of 4 f

2 minutes read
  • LinkedIn
  • X
  • Email

Norfolk Dredging of Chesapeake, Virginia, last Friday won a $9.65 million Craney Island Eastward Expansion contract.

The contract – awarded by the U.S. Army Corps of Engineers, Norfolk District – calls for the mechanical dredging of the top layer of soil material, including debris, to a depth of 4 feet below the mudline within a portion of the footprint of the future main dike of the Craney Expansion project.

According to the Corps, the contractor will separate the debris using screens as the material is loaded into scows, and deposit the dredged material hydraulically within the Craney Island Dredged Material Management Area (CIDMMA).

“ Within the base bid work area the estimated volume to be removed is 284,000 cubic yards and the estimated weight of debris is 7,825 tons. The work potentially could include up to 4 optional areas, each estimated at a volume of 31,500 cubic yards and weight of debris of 840 tons, ” the Corps reported.

The U.S. Army Corps of Engineers and the Virginia Port Authority (VPA) are partnering to construct the Craney Island Eastward Expansion project. Originally designed for a 20 year life span, USACE has been studying ways to extend the life of CIDMMA since the 1970s.

In 1997 the U.S. House of Representatives Committee on Transportation and Infrastructure authorized Norfolk District to prepare a Feasibility Study to determine the feasibility of expanding Craney Island into the east, and to consider rapid filling of the new dredge material site to provide an area for a new marine terminal.

The Feasibility Study, concluded in 2006, determined that the existing CIDMMA would reach capacity in 2025 and the VPA would run out of cargo handling capacity in 2011.

The project of dual purpose, the Craney Island Eastward Expansion will extend the life of Craney Island as a dredged material management area and provide land for construction of a new marine terminal.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & FinanceProject & Tenders

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Port of Vancouver: Dredging work at Second Narrows set for September
Business development

Port of Vancouver: Dredging work at Second Narrows set for September

about 1 month ago

United States to fund construction of Poti Seaport’s new berth
Berth Expansion

United States to fund construction of Poti Seaport’s new berth

about 1 month ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Port of Vancouver: Dredging work at Second Narrows set for September
Business development

Port of Vancouver: Dredging work at Second Narrows set for September

about 1 month ago
United States to fund construction of Poti Seaport’s new berth
Berth Expansion

United States to fund construction of Poti Seaport’s new berth

about 1 month ago