DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Meeting on Souris River Basin Feasibility Study in Minot, ND
Business & Finance

November 9, 2017 · about 8 years ago

Meeting on Souris River Basin Feasibility Study in Minot, ND

The U.S. Army Corps of Engineers, St. Paul District, and the Souris River Joint Water Resources Board, or SRJB, are holding a public meeting to discuss the draft Souris “Mouse” River Basin Feasibility Study and Environmental Assessment on November 16. The meeting will be held at the Minot Municipal

1 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers, St. Paul District, and the Souris River Joint Water Resources Board, or SRJB, are holding a public meeting to discuss the draft Souris “Mouse” River Basin Feasibility Study and Environmental Assessment on November 16.

The meeting will be held at the Minot Municipal Auditorium in Minot, North Dakota. An open house will begin at 6:30 p.m., followed by a formal presentation and public comments/input from 7-9 p.m, said USACE.

The purpose of the feasibility study is to assess the interconnected system of reservoirs, levees and channels within this basin and recommend modifications to existing infrastructure and potential new measures to reduce the risk of flooding.

USACE’s feasibility study is the first step toward a federal flood risk reduction project, and its purpose is to provide Congress with the information it needs to authorize a project for implementation.

The proposed project consists of the construction of what is currently referred to as the ‘Maple Diversion’ or high-flow bypass along with a short tieback levee east of the U.S. 83 Bypass within the city of Minot. The Maple Diversion is a feature of the SRJB’s larger Mouse River Enhanced Flood Protection Project.

The public review period will end November 30.

[mappress mapid=”24603″]

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free