Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Dewberry, USACE Working on the Sweetwater Creek Study
Business & Finance

November 27, 2017 · about 8 years ago

Dewberry, USACE Working on the Sweetwater Creek Study

Dewberry Inc., a Virginia-based engineering consultant, has been selected by the U.S. Army Corps of Engineers, Mobile District, to support a flood risk management feasibility study for the Sweetwater Creek watershed in the northwestern portion of metro Atlanta. According to the company, the study ai

1 minutes read
  • LinkedIn
  • X
  • Email

Dewberry Inc., a Virginia-based engineering consultant, has been selected by the U.S. Army Corps of Engineers, Mobile District, to support a flood risk management feasibility study for the Sweetwater Creek watershed in the northwestern portion of metro Atlanta.

According to the company, the study aims to quantify flood risks and related flooding issues associated with the Sweetwater Creek Watershed, and to identify potential projects to reduce flood risks.

The Sweetwater Creek basin, located in portions of Cobb, Douglas, and Paulding Counties, Georgia, is approximately 260 square miles and drains southeast, discharging into the Chattahoochee River.

This basin has a history of severe flooding, including a historic flood event in September 2009 that caused extensive damage throughout portions of Cobb County.

Dewberry is developing hydrologic and hydraulic models for roughly 75 miles of stream. The models are being developed using the USACE Hydrologic Engineer Center’s (HEC) modeling suite to enable a direct comparison of potential flood mitigation project benefits.

Historic events, including the July 2005 and September 2009 floods, will be used to calibrate the models and demonstrate the potential project benefits. The firm is analyzing six design alternatives along Sweetwater Creek and its tributaries, including channelization, retention, and diversion structures.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & FinanceProject & Tenders

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Port of Vancouver: Dredging work at Second Narrows set for September
Business development

Port of Vancouver: Dredging work at Second Narrows set for September

about 1 month ago

United States to fund construction of Poti Seaport’s new berth
Berth Expansion

United States to fund construction of Poti Seaport’s new berth

about 1 month ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Port of Vancouver: Dredging work at Second Narrows set for September
Business development

Port of Vancouver: Dredging work at Second Narrows set for September

about 1 month ago
United States to fund construction of Poti Seaport’s new berth
Berth Expansion

United States to fund construction of Poti Seaport’s new berth

about 1 month ago