DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Lake Apopka Dredging Project in Full Swing
Business & Finance

December 20, 2017 · about 8 years ago

Lake Apopka Dredging Project in Full Swing

The St. Johns River Water Management District has started work on a sump dredge project designed to help improve water quality at Lake Apopka. According to the District, the project is not expected to impede navigation on the canal or lake. “Our focus remains centered on projects that bring us close

2 minutes read
  • LinkedIn
  • X
  • Email

The St. Johns River Water Management District has started work on a sump dredge project designed to help improve water quality at Lake Apopka.

According to the District, the project is not expected to impede navigation on the canal or lake.

“ Our focus remains centered on projects that bring us closer to our goal of restoring the lake’s ecosystem ,” said St. Johns River Water Management District Executive Director Dr. Ann Shortelle . “ Improved water quality now provides conditions that are allowing native submerged plants to recolonize the lake’s bottom. As these plants expand, they provide the habitat critical to the recovery of the lake’s historic bass fishery .”

She continued by saying that the project is unique from previous dredging projects because it will create a sump, or a depression, at the lake-bottom to collect nutrient-laden sediment near the mouth of the Apopka-Beauclair Canal. Collecting and eventually removing the material is expected to reduce turbidity in Lake Apopka and help improve water quality.

A barge stationed near the canal will use floating pipe to transport material collected from the lake’s bottom to an area west of the canal, where it will raise subsided marsh and bury residual pesticides found on the formerly farmed land. Additionally, if needed, water from the dredging will be routed through the district’s marsh flow-way, a constructed wetland, for additional nutrient removal.

High water levels from Hurricane Irma originally delayed the start of the project, which is expected to run through early 2019 and collect about 500,000 cubic yards of nutrient-laden material.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free