Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›SENER Wins Mega Construction Project in Chile
Business & Finance

January 11, 2018 · about 8 years ago

SENER Wins Mega Construction Project in Chile

The Chilean company Empresa Portuaria San Antonio has awarded SENER the optimization engineering and the detailed design of protection works, dredging and complementary work of the Outer Port – Puerto de Gran Escala (PGE) – in the Port of San Antonio, 100 km from Santiago de Chile. This is the fourt

2 minutes read
  • LinkedIn
  • X
  • Email

The Chilean company Empresa Portuaria San Antonio has awarded SENER the optimization engineering and the detailed design of protection works, dredging and complementary work of the Outer Port – Puerto de Gran Escala (PGE) – in the Port of San Antonio, 100 km from Santiago de Chile.

This is the fourth port project that SENER has developed in Chile in recent years, which consolidates it as one of the leading engineering companies in the port sector.

The Outer Port PGE San Antonio will be located to the south of the current port, which is why the project covers the construction of a new breakwater, a dock and new esplanades that will provide the two new berthing facilities with the space and protection necessary for an efficient port operation.

The design of the PGE San Antonio, from which basic engineering has currently been developed, includes the construction of two major automatic terminals of containers, called South-1 and South-2, with a berthing length of 1.730 m each, that will allow the simultaneous berthing of four large container ship vessels (Class E) in each of the terminals.

The infrastructure will be completed with an access channel, a stacking area and an inland dock.

In aggregate, SENER will design 3,900 m of breakwater,13 million m³ of dredging, four million m³ of riprap and 13 million m³ of backfill in an area in which the maximum seismic acceleration of design is established around 1 g.

[mappress mapid=”24760″]

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & FinanceProject & Tenders

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Port of Vancouver: Dredging work at Second Narrows set for September
Business development

Port of Vancouver: Dredging work at Second Narrows set for September

about 1 month ago

United States to fund construction of Poti Seaport’s new berth
Berth Expansion

United States to fund construction of Poti Seaport’s new berth

about 1 month ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Port of Vancouver: Dredging work at Second Narrows set for September
Business development

Port of Vancouver: Dredging work at Second Narrows set for September

about 1 month ago
United States to fund construction of Poti Seaport’s new berth
Berth Expansion

United States to fund construction of Poti Seaport’s new berth

about 1 month ago