DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Meeting Scheduled for Missouri River Sandbar Habitat Scheme
Business & Finance

January 16, 2018 · about 8 years ago

Meeting Scheduled for Missouri River Sandbar Habitat Scheme

The U.S. Army Corps of Engineers will hold a public meeting tomorrow at the Ramada Bismarck Hotel in Bismarck, ND, to gather input on site selection for an Emergent Sandbar Habitat (ESH) Project within the Missouri River between Garrison and Oahe dams. The meeting will run from 6 to 8 p.m. with a br

1 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers will hold a public meeting tomorrow at the Ramada Bismarck Hotel in Bismarck, ND, to gather input on site selection for an Emergent Sandbar Habitat (ESH) Project within the Missouri River between Garrison and Oahe dams.

The meeting will run from 6 to 8 p.m. with a brief opening presentation followed by an open house session.

“ During the open house, the Corps project team will be available at information stations to answer questions and gather public input. Concerns, comments and suggestions provided at this meeting will help the Corps determine which of three potential sites may be chosen for the project ,” USACE said in its announcement.

The proposed project includes mechanical construction of sandbar habitat, up to 40 acres in size, at one of three existing sandbar habitat sites between river miles 1349 and 1367 (near Washburn, ND).

According to USACE, material would be borrowed from the river bed and placed on top of the existing shallow submerged sandbar. This minimizes the amount of material that needs to be moved and increases longevity of the constructed sandbar.

[mappress mapid=”24750″]

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free