DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Cobourg Hosts Midtown Creek Flood Control Public Meeting
Business & Finance

January 23, 2018 · about 8 years ago

Cobourg Hosts Midtown Creek Flood Control Public Meeting

The Town of Cobourg will host a public information meeting for the Midtown Creek Flood Control Ponding Area and Kerr Street Extension to Division Street West to the railway spur, Class Environmental Assessment (EA). The town is conducting a Municipal Class Environmental Assessment (Class EA) study t

2 minutes read
  • LinkedIn
  • X
  • Email

The Town of Cobourg will host a public information meeting for the Midtown Creek Flood Control Ponding Area and Kerr Street Extension to Division Street West to the railway spur, Class Environmental Assessment (EA).

The town is conducting a Municipal Class Environmental Assessment (Class EA) study to assess the available measures for providing flood protection for structures upstream of the existing railway corridor that crosses Midtown Creek.

The study is being carried out in accordance with the planning and design process for Schedule ‘C’ projects as outlined in the Municipal Class Environmental Assessment (October 2000, as amended in 2007), which is approved under the Ontario Environmental Assessment Act.

The 1st mandatory PIC held on November 29, 2017 presented the problem statement, alternative solutions to the problem statement, and identified the preferred solution which completed Phases 1 and 2 of the EA process.

Currently, the study is at the conclusion of Phase 3 of the EA process where the design alternatives have been evaluated and a preferred design concept has been identified for public comment.

Upon the successful completion of Phase 3, an Environmental Study Report (ESR) will be prepared and made available for public review and comment. It is expected this study will be completed during the winter of 2017/2018 and the preferred design alternative will go to construction in the summer of 2018.

The public meeting will be held on Thursday, January 25 from 5 until 7 pm in the Cameco ‘C’ Room at the Cobourg Community Center (CCC) at 750 D’Arcy Street.

[mappress mapid=”24793″]

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free