DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›USACE Pens Design Agreement for LA River Ecosystem Restoration
Business & Finance

January 26, 2018 · about 8 years ago

USACE Pens Design Agreement for LA River Ecosystem Restoration

The U.S. Army Corps of Engineers’ Los Angeles District has signed a design agreement to move forward with the LA River Ecosystem Restoration project at a recent meeting with city officials. The agreement was formally presented to Gary Lee Moore, Los Angeles city engineer, and Carol Armstrong, execut

1 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers’ Los Angeles District has signed a design agreement to move forward with the LA River Ecosystem Restoration project at a recent meeting with city officials.

The agreement was formally presented to Gary Lee Moore, Los Angeles city engineer, and Carol Armstrong, executive officer to the Los Angeles Deputy Mayor of City Services, during a January 19 LA River site visit with Corps senior leaders, including Lt. Gen. Todd Semonite, commanding general of the Corps; Brig. Gen. Pete Helmlinger, commanding general, South Pacific Division; and Col. Kirk Gibbs, commander of the Los Angeles District.

The project proposes restoration measures in and along an 11-mile stretch of the river to reestablish scarce riparian strand, freshwater marsh and aquatic habitat, while maintaining existing levels of flood risk management.

The plan will restore about 719 acres by widening the river in key areas using terracing and restructuring channel banks to support vegetation, create side channels and off-channel marsh, daylight small streams and remove invasive vegetation.

Associated recreation features include trails, vista points, educational amenities and pedestrian bridges.

Total estimated cost of the project is $1.4 billion and the design agreement will allow the District to begin the preconstruction, engineering and design phase of the project.

The first project feature is scheduled to be awarded for construction in fiscal year 2022.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free